Capital Projects

Our capital budget funds the construction and repair of the County's infrastructure assets such as roads, bridges, buildings, water mains, sewers, and more.


Current project status

View the engineering programs below for a list of current capital engineering projects in the County. 

Cheapside Road Bridge Rehabilitation

Location: Concession 2, Walpole
Timeline: July 25, 2025 to TBD
Project number: ENG-51-2024
Project lead: Mark Long
Ward: 1


Old River Road Pedestrian Bridge Conversion 

Location: Old River Road, North Cayuga
Timeline: Dates still to be confirmed
Project number: ENG-50-2025
Project lead: Mark Long
Ward: 2, 6


Townline Road Pedestrian Bridge 

Location: Haldimand-Dunnville Townline Road, Canborough
Timeline: Dates still to be confirmed
Project number: ENG-50-2025
Project lead: Mark Long
Ward: 4, 6


Lakeshore Road Culvert Replacement

Location: New Lakeshore Road, Dunnville
Timeline: July 15, 2025 to TBD
Project number: ENG-51-2025
Project lead: Mark Long
Ward: 5


Gypsum Mine Culvert Liner

Location: Caledonia Soccer Complex Road
Timeline: September 2025 to TBD
Project number: ENG-51-2025
Project lead: Mark Long
Ward: 3


Concession 6 Walpole Culvert Replacement 

Location: Concession 6, Walpole 
Timeline: July 15, 2025 to TBD
Project number: ENG-51-2025
Project lead: Mark Long
Ward: 1


Highway 54 Bridge Removal & Grand Vista Trail 2 Extension

Location: Munsee Street North/Highway 54, Cayuga 
Timeline: Late spring to late fall, 2025
Project number: ENG-54-2025
Project lead: Mark Long
Ward: 2

Work planned

  • Removal of the existing rail overpass bridge on Haldimand Road 54/Munsee Street North and replacement with a new road profile
    • A bypass road will be constructed on the west side of Haldimand Road 54/Munsee Street North to accommodate traffic throughout construction
  • Creation of an AODA-compliant trailhead and parking area for the Grand Vista Trail
    • The Grand Vista trailhead will be completed following the reopening of Haldimand Road 54

Additional information

A public open house was held on February 18, 2025, to review the design of this project and answer any questions. If you require further information, please contact engineering@haldimandcounty.on.ca.

Timeline: April 14, 2025, to Summer 2025
Project Number: ENG-30-2024
Project Lead: Mark Long
Ward: 1, 4, 5, and 6

Locations

  • Sandusk Road - Highway 6 to Haldimand Road 20
  • 1st Line - Highway 6 to Oneida Road
  • Rainham Road - Haldimand Dunnville Townline Road to Haldimand Road 20
  • Robinson Road - Highway 3 to Bird Road

Work planned

  • Placement of Hot Mix Asphalt
  • Recycling of existing pavement
  • Road resurfacing
  • Driveway and culvert replacements or flushing
  • Ditching and cross-culvert repairs or replacement

North Forks Maintenance

Location: Lowbanks
Timeline: December 2024 to December 2025
Project number: ENG-10-2024 
Project lead: John Van Rooy
Ward: 5


South Forks Maintenance

Location: Lowbanks 
Timeline: December 2025 to December 2025
Project number: ENG-10-2024 
Project lead: John Van Rooy 
Ward: 5


Maple Creek Maintenance

Location: Dunnville 
Timeline: December 2025 to December 2025
Project number: ENG-10-2024 
Project lead: John Van Rooy 
Ward: 6


Maple Creek Dunn Branch Maintenance

Location: Dunnville
Timeline: December 2025 to December 2025
Project number: ENG-10-2024 
Project lead: John Van Rooy 
Ward: 5


Pat Warren Maintenance

Location: Dunnville
Timeline: December 2025 to December 2025
Project number: ENG-10-2024 
Project lead: John Van Rooy 
Ward: 6

 

Jarvis Road Reconstruction

Timeline: July 2024 to Summer 2025
Project number: ENG-52-2024
Project lead: Danielle Fletcher
Ward: 1

Work planned

Keen Street - Peel Street to the end

  • Watermain replacement (completed in 2024)
  • Sewer lining replacement
  • Final paving to be completed this Spring/Summer 2025

Peel Street East - Craddock Boulevard to the end

  • Watermain and sewer replacement (completed in 2024)
  • Final paving to be completed this Spring/Summer 2025

Peel Street East - Walpole Drive East to the end

  • Watermain and sewer replacement (completed in 2024)
  • Final paving to be completed this Spring/Summer 2025

Peel Street East - Main Street North to Walpole Drive

  • Watermain replacement
    Road resurfacing and curb/sidewalk replacement 

Walpole Drive - Talbot Street East to Peel Street East

  • Watermain and sewer replacement (completed in 2024)
  • Sidewalk replacement and new curb installation
  • Final paving to be completed this Spring/Summer 2025

Walpole Drive - Monson Street to Peel Street East

  • Watermain and sewer replacement
  • Sidewalk replacement and new curb installation t
    Final paving to be completed this Spring/Summer 2025

Additional Information

Construction began in 2024 with a break for the winter, starting up again in the spring of 2025.


Caledonia Road Reconstruction

Timeline: Dates still to be confirmed
Project number: ENG-55-2025
Project lead: Danielle Fletcher
Ward: 3

Planned locations

  • Aberdeen Street - Sutherland Street East to Burke Drive
  • Gypsum Avenue - Argyle Street North to the end
  • Inverness Street - Caithness Street West to Orkney Street West
  • Sutherland Street West - Inverness Street to Shetland Street

Hagersville Road Reconstruction

Timeline: April 22, 2025 to November 2025
Project number: ENG-52-2025
Project lead: Danielle Fletcher
Ward: 4

Work planned

Athens Street - Sherring Street North to Cedar Street

  • Watermain replacement
  • New curb installations on both sides of the roadway
  • New sidewalk installations along the north side of the roadway
  • Road Resurfacing to be completed by June 1, 2025 

Tuscarora Street - King Street West to Oneida Street

  • Watermain replacement
  • Sanitary repairs/lining
  • Existing curb and sidewalk replaced and paved
  • Road resurfacing

King Street West - north of the rail line to Tuscarora Street

  • Watermain replacement
  • Road resurfacing

Parkview Street/Concession 12 - Main Street South to the rail line

  • Watermain replacement
  • New curb and new sidewalk installations on the north side of the roadway
  • Road resurfacing

Hagersville Arena Parking Lot Resurfacing

  • Parking lot to be milled, re-paved, and re-painted

Rural Road Resurfacing 

Timeline: Dates still to be confirmed
Project number: ENG-22-2025
Project lead: John Van Rooy
Ward: 1, 2, 4, and 5

Locations

  • Concession 1 Road Seneca - Highway 56 to Caistorville Road
  • Concession 2 Walpole - Cheapside urban boundary to Haldimand Road 53
  • Erie Street South - Bluewater Parkway to Lakeshore Road
  • Lakeshore Road - Brookers Road to Haldimand-Dunnville Townline Road
  • Shoreline Trail
  • South Coast Drive - Rainham Road to Cheapside Road
  • Sweets Corners Road - Lakeshore Road to Rainham Road
  • Townline Road West - Haldimand Road 20 to the river

Work planned

  • Culvert repairs
  • Ditching
  • Road resurfacing

Dunnville Urban Overlay 

Timeline: Mid-July 2025 to Mid-October 2025 (weather permitting)
Project number: ENG-31-2025
Project lead: Lucas Hunter
Ward: 6

Work planned

Griffith Street - South Cayuga Street West to Alder Street West 

  • Full-depth removal of the existing road surface
  • Removal and replacement of the existing sidewalk with a new 1.5 m sidewalk
  • Removal and replacement of the existing curb
  • New curb on the west side of Griffith Street
  • Paving a new base and surface of asphalt

Pine Street - Lock Street West to Alder Street West

  • Full-depth removal of the existing road surface
  • Removal and replacement of the existing sidewalk with a new 1.5 m sidewalk
  • New 1.5 m sidewalk on the west side of Pine Street from Central Line South to connect the existing sidewalk to Lock Street West
  • Removal and replacement of the existing curb
  • Paving a new base and surface of asphalt

Lock Street - West limit to George Street

  • Full-depth removal of the existing road surface
  • Removal and replacement of the existing sidewalk with a new 1.5 m sidewalk
  • Removal and replacement of the existing curb
  • Paving a new base and surface of asphalt

Springvale Urban Overlay 

Timeline: Early May, 2025 to Mid-July, 2025 (weather permitting)
Project Number: ENG-31-2025
Project Lead: Lucas Hunter
Ward: 1

Work planned

Haldimand Road 55 (within urban limits)

  • Milling the top 50 mm of the existing asphalt surface
  • Completing road base repairs as required
  • Removal and replacement of the existing curb
  • Removal and replacement of the existing sidewalk with a  new 1.8 m sidewalk
  • Paving a new surface of asphalt

Concession 14 (within urban limits)

  • Full-depth removal of the existing road surface
  • Removal and replacement of the existing sidewalk with a new 1.5 m sidewalk from Haldimand Road 55 to the box culvert, approximately 50 m east of Maplewood Avenue
    • This section of the sidewalk will be replaced with an asphalt shoulder with a painted line separating vehicles and pedestrians
  • Paving a new surface of asphalt

We recognize the impacts of construction on day-to-day activities and strive to complete projects in an efficient and timely manner to minimize disruption to residents, businesses and tourists.

Contact Us

Engineering & Capital works
53 Thorburn Street South
Cayuga, Ontario
Canada, N0A 1E0

Email Engineering
Phone: 905-318-5932